The 7-Step Checklist
-
Step 1: Start with the fixture spec sheet, not the price list
-
Step 2: Define the footprint before you choose a fixture
-
Step 3: Separate primary fixtures from supplemental fixtures
-
Step 4: Verify compliance before you compare total cost
-
Step 5: Calculate total cost per usable fixture, not per watt
-
Step 6: Read the full greenhouse lighting catalog, not the one-page summary
-
Step 7: Pilot one unit before you commit to the full PO
-
Extra steps for OEM and private-label buyers
-
Step 1: Start with the fixture spec sheet, not the price list
-
What to Watch Out For
-
The Bottom Line for 2026
If you are about to spec a Gavita LED grow light for a greenhouse, a distribution lineup, or an OEM project, don't start with the price list. Start with the spec sheet—then work through this checklist. I've been on the buying side of horticultural lighting for six years, and this process has caught more pricing and compliance problems than I can list.
I'm a procurement manager at a 140-person lighting distribution company. I've managed a horticultural lighting budget of roughly $1.1 million per year, negotiated with more than 30 vendors, and logged every order in our cost tracking system. Consider this a horticultural lighting specification guide for buyers who need to make a decision this month.
This checklist has seven steps. Use it when you are comparing Gavita SKUs for a specific footprint, building a greenhouse lighting catalog for resale, or doing a vendor review. After the first pass, you can re-run only the steps that changed.
The 7-Step Checklist
Step 1: Start with the fixture spec sheet, not the price list
It's tempting to open a greenhouse lighting catalog and sort by unit price. I've done it, and it rarely ends well. A fixture is not a commodity. Two LED fixtures can look similar in a brochure and behave very differently in a greenhouse.
For every candidate Gavita SKU, pull the published spec sheet and check three numbers: input wattage, PPF, and photon efficacy. PPF stands for photosynthetic photon flux, and it tells you how many photons the fixture emits in the range plants use. Photon efficacy is PPF divided by input watts, so it is a closer proxy for efficiency. If a supplier can't show those numbers on a current datasheet, treat the quotation as incomplete.
Checkpoint: make sure the exact SKU on your quote matches the datasheet. If the catalog number is different, stop.
Step 2: Define the footprint before you choose a fixture
A fixture does not have a fixed coverage area. It has a light distribution pattern that changes with hanging height, canopy structure, row spacing, and reflective surfaces in the room.
In Q2 2024, I almost approved an order for 240 Pro 1700E fixtures based on a coverage rule from a sales rep. When we loaded the photometric file into the layout, the real uniformity at our mounting height did not match that rule. We cut the order to 210 fixtures. That's not a small miss when each fixture is over a thousand dollars.
If the project is large, ask for the IES file and run a simple lighting layout before you send a PO.
Checkpoint: write down the hanging height and mounting plan for each zone. If you can't explain it in one sentence, you're not ready to order.
Step 3: Separate primary fixtures from supplemental fixtures
Gavita's current line includes primary fixtures and supporting fixtures. The Pro 1700E, 1900E, and 2400E are typically primary sources. The CT 1930E, UV bars, Clone Bars, and Under Canopy fixtures are designed for specific jobs.
What most people don't realize is that these categories are not interchangeable. I've seen budgets blow up because a buyer assumed one LED bar could do every job. It can't. A UV bar is not a lower-power replacement for a Pro fixture, and an Under Canopy fixture is not a substitute for top light.
Checkpoint: list every growing zone and label each fixture as primary or supplemental. If a SKU is supplemental, don't size the electrical service as if it were primary.
Step 4: Verify compliance before you compare total cost
A low unit price is worthless if the fixture can't be installed legally or insured. Compliance is not a checkbox. It is a procurement requirement.
Ask for the exact SKU's UL/ETL listing, IP rating, dimming compatibility, and DLC listing if the project uses utility rebates. Export orders need CE/UKCA or whatever applies in the destination market. Also check warranty terms: some fixtures require registration within 30 days, and missing that window changes replacement cost.
Here's something vendors won't tell you: compliance documents are tied to specific model versions. A small revision can change the listing status. As of April 2026, Gavita's published spec sheets list these details by SKU—but verify the current version before you issue a PO.
Checkpoint: collect the compliance documents for each exact SKU before you request final pricing.
Step 5: Calculate total cost per usable fixture, not per watt
Unit price is the beginning of the calculation, not the end. The real number is total cost per usable fixture over the life of the project.
When I compared two LED quotes in 2025, one supplier quoted $1,150 per fixture. Another quoted $995. The $995 fixture looked better until we added hangers at $90, dimming cables at $35, and freight at $60 per fixture. That brought it to $1,180. The first quote included those items. That's a 12% difference hidden in the fine print.
Your TCO model should include:
- fixture price
- mounting hardware and cables
- freight, customs, and brokerage
- installation labor
- controls integration
- energy use over the expected life
- replacement parts during the warranty period
I built a cost calculator after getting burned on hidden fees twice. It is not complicated, but it makes every quote show the same set of inputs.
Checkpoint: every quote must be itemized into the same cost categories. If a quote is missing a category, ask why.
Step 6: Read the full greenhouse lighting catalog, not the one-page summary
When someone asks me for a Gavita greenhouse lighting catalog, I tell them to request the specification version, not the brochure version. The spec version includes photometric files, wiring diagrams, dimensional drawings, and compliance notes.
The catalog also explains how the products fit together. You might find that a CT 1930E is a better fit for a low-ceiling layout than the Pro line, or that the Under Canopy kit solves a lower-canopy problem. The brochure gives you product names. The full catalog gives you the logic.
One caution: don't mix horticultural lighting specs with commercial downlight specifications. A downlight spec sheet speaks in lumens, CCT, CRI, and beam angle. A grow light spec sheet speaks in PPF, photon efficacy, spectrum, and DLI. If a supplier's catalog includes both, keep the two categories separate in your evaluation.
Checkpoint: confirm you have photometric files and dimensional drawings, not just product photos.
Step 7: Pilot one unit before you commit to the full PO
The most expensive mistake is signing off on hundreds of units before verifying one. Every project feels urgent. The strongest cost-control move I know is to pilot one fixture in the real environment.
Order one unit, install it at the target height, run it for at least 100 hours, measure the light distribution, test the controls, and photograph the installation. Then approve the full line.
I almost skipped this step in 2025 because the sales rep said everyone buys the 2400E for that footprint. The pilot surprised me. I expected the larger fixture to be the obvious choice; it wasn't. The 1900E gave us better uniformity at our mounting height—or rather, its distribution matched our layout better. That one pilot fixture saved more than $30,000 on the final order.
Checkpoint: get written sign-off from the installer and the grower before moving to a full PO.
Extra steps for OEM and private-label buyers
If you are ordering under your own brand, add two more checks. Confirm MOQ, packaging, and branding in writing. Ask whether a driver or optics modification changes the compliance listing. A custom SKU is a different product from the standard SKU, and the paperwork should reflect that.
What to Watch Out For
These are mistakes I've made or almost made:
- Sorting by price per watt. Price per delivered photon is more useful, but it still ignores installation and compliance.
- Applying one coverage number to every greenhouse. Coverage depends on hanging height, row spacing, and canopy goals.
- Rushing past compliance. In my first year, I approved a rush order for a fixture that was not listed for our local electrical inspection. The redo cost $1,200 plus three lost days.
- Assuming the new fixture fits the old mount points. LED retrofits are not always drop-in replacements.
- Mixing grow light specs with downlight specs in a mixed catalog. Different units, different tolerances, different compliance rules.
None of this is exotic. It's just the difference between a purchase order and a procurement decision.
The Bottom Line for 2026
The fundamentals of horticultural lighting buying have not changed: know the footprint, verify the spectrum, check compliance, and calculate real cost. But the products have changed, and so has the standard practice. A model selection that made sense in 2022 may not be the right call in 2026. Run the checklist, log your decisions, and update your standard spec when the next catalog version is published.